Azizi Developments said that it selected Doka to provide a solution for the Burj Azizi Car Park Building 1 within one of the most space-constrained sites in Dubai.
Doka’s model is said to have delivered pre-assembled components on a coordinated, just-in-time schedule, removing the need for on-site storage. This effectively eliminated logistics-related limitations, ensuring a streamlined process.
The building’s core progressed independently, while floor levels progressed in rapid, repeatable cycles; essential for a structure designed for speed and efficiency, Azizi Developments said in a statement.

Farhad Azizi, Group CEO of Azizi Group said, “Burj Azizi will be the world’s second-tallest tower, and everything connected to it must reflect that distinction. From core structures to supporting infrastructure, precision is non-negotiable. Doka brings the discipline and consistency required to execute at this level.”
Construction commenced in November 2024, the project is part of Azizi’s extensive development pipeline of 150,000 units under construction. The 14-storey parking structure on Sheikh Zayed Road will be an integral part of the experience Azizi Developments is creating with Burj Azizi.